Photovoltaic Systems of:
4.8 kWp, 7.2 kWp, 9.6 kWp & 12 kWp.

The systems are designed to integrate into the existing electrical grid, combining the best of on-grid systems and monitoring via Wi-Fi. The user has the option of selling the surplus energy collected during the day to the distribution company.
The maximum power (kWp) of the photovoltaic system is indicative.
Includes the signing of the connection protocol by the distribution company to enable the start-up of the generation unit.
Keys that make us stand out in the market

Group of certified and trained experts in the solar energy sector with more than 20 years of experience in multiple photovoltaic projects executed throughout Chile

Comprehensive advice and budget for your residential photovoltaic energy project, suggesting the most appropriate solution for your requirements.

Your proposal includes a thorough analysis of panel orientation, connection power, pipe routing, inverter and panel location, as well as meter connection and grounding.

We evaluate the feasibility of the installation based on the available space, the roof material and the energy consumption of your home.

We assure you the quality and satisfaction of the project.
Besides:
If you decide to carry out your project with us, the cost of the visit will be deducted from the total cost of the project.
-07-07.png)
Procedure:
Visit technical evaluation.
Corresponding electrical cables.
Pipe channeling.
Photovoltaic panel with adequate protections.
Processing of documents for connection to the electricity distribution network.
Start-up.
After-sales service and constant monitoring of your system.
-06.png)
Source: Termic.cl
Although these are important requirements, we can adapt the project to your needs.
Considerations:
If special work or additional materials are required for the installation, these will be reported during the technical visit and the costs will be the responsibility of the client.
If you have a home, commercial or industrial infrastructure with Chilean or colonial tiles, it will be necessary to evaluate the feasibility of the installation. According to the analysis, this could result in the cancellation of the purchase up to 20 business days after it was made; otherwise, administrative costs will be incurred by the client.
Projects will not be carried out on roofs with asbestos coverings, or on buildings under construction or repair, whether total or partial, if the work is not completely finished.
If during the technical visit we identify any of the situations mentioned above, we will automatically cancel the purchase and refund the money, not including any administrative costs that may arise.
Let's evaluate your project:
Please enter your queries in the following form.
Follow us on our social networks:


BRANDS WE WORK WITH









